{"id":4870,"date":"2020-05-15T17:06:16","date_gmt":"2020-05-15T15:06:16","guid":{"rendered":"http:\/\/www.hermes-sp.eu\/?p=4870"},"modified":"2020-05-26T10:53:13","modified_gmt":"2020-05-26T08:53:13","slug":"text","status":"publish","type":"post","link":"https:\/\/www.hermes-sp.eu\/?p=4870","title":{"rendered":"Mid term milestone reached!"},"content":{"rendered":"<p style=\"text-align: justify;\">The HERMES-SP project reached its mid term milestone the last April 30 2020.<br>The following 10 documents were prepared and submitted on the EC portal for a total of more than 1000 pages:<\/p>\n<ul style=\"text-align: justify;\">\n<li>D1.4 Interim periodic report M1-M18 WP1 INAF<\/li>\n<li>D3.1 Payload Design Document WP3 INAF<\/li>\n<li>D3.2 Design Definition File (Space Segment) WP3 POLIMI<\/li>\n<li>D3.3 Design Definition File (MOC) WP3 DEIMOS<\/li>\n<li>D3.4 SOC design document WP3 UNICA<\/li>\n<li>D4.1 Payload System Assembly, Integration, and Testing Plan WP4 INAF<\/li>\n<li>D5.1 System Assembly, Integration, and Verification Plan WP5 POLIMI<\/li>\n<li>D5.2 Ground Support Equipment WP5 POLIMI<\/li>\n<li>D8.6 Communication plan RP2 WP8 FPM<\/li>\n<li>D8.7 Market studies and innovation plan WP8 FPM<\/li>\n<\/ul>\n<p style=\"text-align: justify;\">The documents present the detailed design of both flight and ground segments, and the flight segment integration and test plans, with a detailed schedule, which is consistent with the production, test, qualification and test of three flight units by Nov. 2021.<br>The schedule takes into account a delay of about three months due to the Covid-19 emergency.<br>Should the emergency resume or get worse in the following months, the schedule must be updated and accordingly the project should be extended.<\/p>\n<p style=\"text-align: justify;\">INAF, FBK and EKUT laboratories started to be again partially available starting from the beginning of May 2020.<br>Detector system integration and test activities resumed at these laboratories, even if at a pace slower than normal.<\/p>\n\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.hermes-sp.eu\/wp-content\/uploads\/2020\/05\/metrologia_scatola_20200512_03.jpeg\" alt=\"\" class=\"wp-image-4873\" width=\"240\" height=\"320\" srcset=\"https:\/\/www.hermes-sp.eu\/wp-content\/uploads\/2020\/05\/metrologia_scatola_20200512_03.jpeg 480w, https:\/\/www.hermes-sp.eu\/wp-content\/uploads\/2020\/05\/metrologia_scatola_20200512_03-225x300.jpeg 225w\" sizes=\"auto, (max-width: 240px) 100vw, 240px\" \/><figcaption>Accurate metrology measurements on the detector system crystal box at INAF-IAPS labs<\/figcaption><\/figure><\/div>\n\n\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.hermes-sp.eu\/wp-content\/uploads\/2020\/05\/image-4.png\" alt=\"\" class=\"wp-image-4875\" width=\"320\" height=\"240\" srcset=\"https:\/\/www.hermes-sp.eu\/wp-content\/uploads\/2020\/05\/image-4.png 640w, https:\/\/www.hermes-sp.eu\/wp-content\/uploads\/2020\/05\/image-4-300x225.png 300w\" sizes=\"auto, (max-width: 320px) 100vw, 320px\" \/><figcaption>Mechanics needed for integration prepared at FBK labs<\/figcaption><\/figure><\/div>\n\n\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.hermes-sp.eu\/wp-content\/uploads\/2020\/05\/siliconpad_before-cutting2-1030x446.png\" alt=\"\" class=\"wp-image-4876\" width=\"515\" height=\"223\" srcset=\"https:\/\/www.hermes-sp.eu\/wp-content\/uploads\/2020\/05\/siliconpad_before-cutting2-1030x446.png 1030w, https:\/\/www.hermes-sp.eu\/wp-content\/uploads\/2020\/05\/siliconpad_before-cutting2-300x130.png 300w, https:\/\/www.hermes-sp.eu\/wp-content\/uploads\/2020\/05\/siliconpad_before-cutting2-768x333.png 768w, https:\/\/www.hermes-sp.eu\/wp-content\/uploads\/2020\/05\/siliconpad_before-cutting2-1536x665.png 1536w, https:\/\/www.hermes-sp.eu\/wp-content\/uploads\/2020\/05\/siliconpad_before-cutting2.png 1815w\" sizes=\"auto, (max-width: 515px) 100vw, 515px\" \/><figcaption>Steps in the fabrication of the silicon pad that acts as a optical contact between SDD and scintillator crystals<\/figcaption><\/figure><\/div>\n\n\n\n<p style=\"text-align: justify;\">We hope that POLIMI laboratories will be accessible again starting from the beginning of June 2020.<\/p>\n<p style=\"text-align: justify;\">Development of both PDHU and OBC on board software is proceeding at EKUT and POLIMI.<\/p>\n<p style=\"text-align: justify;\">Mid term review meeting will be held in virtual form on next June 24-25 2020. Presentations will include a progress report on the project, matter from the M18 deliverables listed above, as well as revisions of the deliverables for the M12 milestone.<\/p>\n<p style=\"text-align: justify;\">The project Critical Design Review will be held in two phases. The first during the June 24-25 meeting, concerning the assessment and verification of the design using analytic tools. The second mid October 2020, concerning sub-system functional and ambient tests.<\/p>\n\n\n\n<figure class=\"wp-block-embed-facebook aligncenter wp-block-embed is-type-video is-provider-facebook\"><div class=\"wp-block-embed__wrapper\">\nhttps:\/\/www.facebook.com\/HermesConstellation\/videos\/273550307360804\/\n<\/div><\/figure>\n\n\n\n<figure class=\"wp-block-embed-facebook aligncenter wp-block-embed is-type-video is-provider-facebook\"><div class=\"wp-block-embed__wrapper\">\nhttps:\/\/www.facebook.com\/HermesConstellation\/videos\/1001027077016152\/\n<\/div><figcaption>Our payload engineers\u00a0<a href=\"https:\/\/www.facebook.com\/yuri.evangelista.9?__tn__=K-R&amp;eid=ARBvobczil08l1f6-NCvZMs4R3-ksW6WJJ-FjamVvw0Hi8Kx0rwFG2tNoMnjbZuo2VMSaOzKH2UPBCC7&amp;fref=mentions&amp;__xts__%5B0%5D=68.ARA9JztxJ6T8VEYOB76Yw0gk-5-HtUUu9C_-iCx5pQ5-mhHsK9g8GVcBLvqfp2LHcLKO9EOIhkM6m-henPp1AzG37Sp_KvYCo3-aLo3B2COf2Dtqd1Vmz14iN-HJ7UJFGO2wQ2ENjhJnmQWBZ9abaGYAgqQcc22mK6Oeq4Sqr2tlvRe4jPYdBllQjgC19ZAp9VXDhpVYzFJJ1rkfzRQrxVT7kYWLKMlNRHvOw8hc0kldLQBI4X8vt4bfJsKO36xMKbC3662LY_7jqqUNLA5II4kI6ORRkvJXG0-ejDAZggph1dBmbOJ_7zs8ESuZ9ewNY-A0ne-jqyDLuBnl5Hol7Wu0SpoKzGBU\">Yuri Evangelista<\/a>\u00a0and Raffaele Piazzola working on the accurate metrology measurements of the\u00a0<a href=\"https:\/\/www.facebook.com\/hashtag\/hermes?__eep__=6&amp;source=feed_text&amp;epa=HASHTAG&amp;__xts__%5B0%5D=68.ARA9JztxJ6T8VEYOB76Yw0gk-5-HtUUu9C_-iCx5pQ5-mhHsK9g8GVcBLvqfp2LHcLKO9EOIhkM6m-henPp1AzG37Sp_KvYCo3-aLo3B2COf2Dtqd1Vmz14iN-HJ7UJFGO2wQ2ENjhJnmQWBZ9abaGYAgqQcc22mK6Oeq4Sqr2tlvRe4jPYdBllQjgC19ZAp9VXDhpVYzFJJ1rkfzRQrxVT7kYWLKMlNRHvOw8hc0kldLQBI4X8vt4bfJsKO36xMKbC3662LY_7jqqUNLA5II4kI6ORRkvJXG0-ejDAZggph1dBmbOJ_7zs8ESuZ9ewNY-A0ne-jqyDLuBnl5Hol7Wu0SpoKzGBU&amp;__tn__=%2ANK-R\">#HERMES<\/a>-SP Payload Demonstration Model (DM) at\u00a0<a href=\"https:\/\/www.facebook.com\/hashtag\/inaf?__eep__=6&amp;source=feed_text&amp;epa=HASHTAG&amp;__xts__%5B0%5D=68.ARA9JztxJ6T8VEYOB76Yw0gk-5-HtUUu9C_-iCx5pQ5-mhHsK9g8GVcBLvqfp2LHcLKO9EOIhkM6m-henPp1AzG37Sp_KvYCo3-aLo3B2COf2Dtqd1Vmz14iN-HJ7UJFGO2wQ2ENjhJnmQWBZ9abaGYAgqQcc22mK6Oeq4Sqr2tlvRe4jPYdBllQjgC19ZAp9VXDhpVYzFJJ1rkfzRQrxVT7kYWLKMlNRHvOw8hc0kldLQBI4X8vt4bfJsKO36xMKbC3662LY_7jqqUNLA5II4kI6ORRkvJXG0-ejDAZggph1dBmbOJ_7zs8ESuZ9ewNY-A0ne-jqyDLuBnl5Hol7Wu0SpoKzGBU&amp;__tn__=%2ANK-R\">#INAF<\/a>&#8211;<a href=\"https:\/\/www.facebook.com\/hashtag\/iaps?__eep__=6&amp;source=feed_text&amp;epa=HASHTAG&amp;__xts__%5B0%5D=68.ARA9JztxJ6T8VEYOB76Yw0gk-5-HtUUu9C_-iCx5pQ5-mhHsK9g8GVcBLvqfp2LHcLKO9EOIhkM6m-henPp1AzG37Sp_KvYCo3-aLo3B2COf2Dtqd1Vmz14iN-HJ7UJFGO2wQ2ENjhJnmQWBZ9abaGYAgqQcc22mK6Oeq4Sqr2tlvRe4jPYdBllQjgC19ZAp9VXDhpVYzFJJ1rkfzRQrxVT7kYWLKMlNRHvOw8hc0kldLQBI4X8vt4bfJsKO36xMKbC3662LY_7jqqUNLA5II4kI6ORRkvJXG0-ejDAZggph1dBmbOJ_7zs8ESuZ9ewNY-A0ne-jqyDLuBnl5Hol7Wu0SpoKzGBU&amp;__tn__=%2ANK-R\">#IAPS<\/a>\u00a0Labs.<\/figcaption><\/figure>\n\n\n\n<p>\u00a0<\/p>\n<p>\u00a0<\/p>\n\n\n\n<div class=\"wp-block-buttons aligncenter is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button is-style-fill\"><a class=\"wp-block-button__link has-background\" href=\"https:\/\/www.hermes-sp.eu\/?p=4811\" style=\"background-color:#5895a8\">Click to support us!<\/a><\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The HERMES-SP project reached its mid term milestone the last April 30 2020.The following 10 documents were prepared and submitted on the EC portal for a total of more than 1000 pages: D1.4 Interim periodic report M1-M18 WP1 INAF D3.1 Payload Design Document WP3 INAF D3.2 Design Definition File (Space Segment) WP3 POLIMI D3.3 Design [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":4918,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"cybocfi_hide_featured_image":"","footnotes":""},"categories":[26],"tags":[],"class_list":["post-4870","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/www.hermes-sp.eu\/index.php?rest_route=\/wp\/v2\/posts\/4870","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.hermes-sp.eu\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.hermes-sp.eu\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.hermes-sp.eu\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.hermes-sp.eu\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=4870"}],"version-history":[{"count":0,"href":"https:\/\/www.hermes-sp.eu\/index.php?rest_route=\/wp\/v2\/posts\/4870\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.hermes-sp.eu\/index.php?rest_route=\/wp\/v2\/media\/4918"}],"wp:attachment":[{"href":"https:\/\/www.hermes-sp.eu\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=4870"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.hermes-sp.eu\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=4870"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.hermes-sp.eu\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=4870"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}