Jul 27

Integration of HERMES detector system at FBK Labs

The activities of integration and test of the hermes payload resumed at FBK labs starting from the beginning of June 2020 with the preparation of the jigs needed for the integration, and the finalization of the procedure for the SDD reinforcement.  Schedule (Jul. 27 – Sept. 11) 1 Crystal Wrapping & crystal box assembly 2020 […]

error

Enjoy HERMES-SP? Please spread :)